Before you start testing, check the following:
- The product is in good condition
- No damage to any parts
- Wiring is all secure
- The unit is in the closed position
- Test the mechanism
- See page 16 for remote operations
Installation: Stage 1
Page 5 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PH2 - Projector Hinge
Test the unit when it is sitting
on the floor and is secure!
Open Position Closed Position
Testing
90
Mechanism Movement