
Connecting the PM system to the locking collar
Hook the main body on to the bottom of the ceiling mount part of the system.
Tighten the large nut down to secure the main body in place.
PM - Projector Mount System
Installation: Stage 4
Page 1
1 of 14 // email
[email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
All of the Locking Collars on the
different options are the same, and
work in the same way.
Comentários a estes Manuais