
The IR sensor can be located anywhere outside of the cabinet.
Fix the IR Sensor and Run the Mechanism
Installation: Stage 10
Page 14 of 20 // email
[email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
ML - Heavy Duty Lift Mechanism
It is very important that once the mechanism is set up, the lift is run in and
out a number of times to bed in and stabilise.
It may then be necessary to re-adjust the height and / or level of the lifting
beam, as first discussed in Stage 4 of these instructions.
Comentários a estes Manuais