Stage 9
R
un T
he M
echanism
RUNNING THE
MECHANISM
It is very important that once
the mechanism is set up, the
lift is run up and down a
number of times and
that grease is applied to
the racks.
It may then be nessary to
re-adjust the height
of the
lifting beam, as
first dicussed in Stage 4
of these instructions.
Sheet 10 of 17
ISSUE: 006
www.futureautomation.co.uk
FUTURE
AUTOMATION
PLH
Plasma Lift Hinge Mechanism
Instruction Sheet