Future-automation PL Manual do Utilizador Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 22
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
The IR sensor can be located anywhere outside of the cabinet.
It is very important that once the mechanism is set up, the lift is run up
and down a number of times to allow the straps to bed in and stabilise.
It may then be nessary to re-adjust the height and / or level of the lifting
beam, as first dicussed in Stage 4 of these instructions.
Fix the IR Sensor and Run the Mechanism
Installation: Stage 10
Page 14 of 20 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PL - Plasma Lift
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 21 22

Comentários a estes Manuais

Sem comentários