Future-automation AL675 Manual do Utilizador Página 10

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 20
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 9
Installation: Stage 5
Page 9 of 18 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
AL675 UDC1 Actuator Lift
Mounting the screen
-Place the screen uprights into
position on the back of the
screen
-Secure into place using the
range of nuts, bolts and washers
provided
-Once the screen uprights
are attached, overlap the
screen to the horizontal bars
the same way as they were
taken off
-Tighten x4 bolts back up to
lock the screen into position
as shown in the detail view
-Make sure the screen is
centralized in the middle of
the mechanism
Vista de página 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 19 20

Comentários a estes Manuais

Sem comentários